• werewolf_nr@fig.systems
    link
    fedilink
    arrow-up
    5
    ·
    1 year ago

    Only the most optimistic guesses about their air suggest there is any left in it at this point. We’re pretty much at the recovery phase.

      • werewolf_nr@fig.systems
        link
        fedilink
        arrow-up
        12
        ·
        1 year ago

        That was the spec sheet provided by the company, but without any backing info, testing, or engineering expertise. The more digging people have done on this submarine, the more of an absolute shit show it is.

      • Xtallll@lemmy.blahaj.zone
        link
        fedilink
        arrow-up
        5
        ·
        1 year ago

        96 hours for 5, an unethical, penny pinching, corner cutting CEO could find a way to stretch that air for almost 500 hours.