• sunzu2@thebrainbin.org
    link
    fedilink
    arrow-up
    3
    arrow-down
    9
    ·
    2 hours ago

    But AT LEAST it’s not another coal mine reopening or a new pipeline.

    You are providing politcal cover for this extraction attempt… I am clarifying the record that giving mega corps money to so they can fund their datacenter infrastructure is not good. If they want to do this, let them pay for it.

    Y’all need to start thinking at system level instead of larping corpo propaganda to get you accept a hand out.

    • ramble81@lemm.ee
      link
      fedilink
      English
      arrow-up
      7
      arrow-down
      1
      ·
      1 hour ago

      You’re missing his point because you want t trumpet your own. Let me flip the question around a bit

      If they were to build for, and pay for the electrical capacity on their own dime, would you prefer them doing it with nuclear or coal?

      • sunzu2@thebrainbin.org
        link
        fedilink
        arrow-up
        1
        arrow-down
        6
        ·
        1 hour ago

        If they were to build for, and pay for the electrical capacity on their own dime, would you prefer them doing it with nuclear or coal?

        Lesser of two evils set up created by the owner class and y’all just larp it at every turn…

        I guess we deserve the regime we got.

        Until plebs start think on systemic level, nothing will change.

        But sure cheer, for mega corp getting a hand out because you like the type of hand they got!

        • gsfraley@lemmy.world
          link
          fedilink
          English
          arrow-up
          4
          ·
          37 minutes ago

          My guy, he’s making a pretty limited point and is agreeing with you. You’re strawmanning his comments to an absurd degree.